Storage Tank 12 internal inspection
- 1Field SupervisorEndorsed
- 2HSSE OfficerYour turn
- 3Site ManagerSigns after tier 2
Raise a permit-to-work with its safety checklist, run the day's PPE and site inspections, and log hazards with a severity and a due date. Each permit climbs Field Supervisor, HSSE Officer and Site Manager before the first spark.
A permit-to-work starts with the officer who raises it and its safety checklist. Then it climbs: the Field Supervisor endorses it, the HSSE Officer endorses it, and the Site Manager gives the final sign-off. Nobody can jump a tier.
Whoever holds the next signature sees it first thing, at the top of Needs attention, marked in gold.

Daily PPE checks and site inspections, point by point. Zone B scaffold audit stands at 4/6 while Bilal Ahmed works through it.
A failed point becomes a defect with its location, a severity and a due date: Exposed cable at MCC-3, Sector 4 · MCC Room 3.
Past its due date, the corrective action turns red on every dashboard. Every point that passes lifts the zone’s compliance score.

SOPs, audit reports and certificates, one current copy for everyone.
Supervisors, officers and the site manager in one thread per site.
Fire, medical and control room numbers, ready when the radio is busy.
Who can raise, endorse and approve, set once per site.
Three roles, in order: the Field Supervisor, then the HSSE Officer, then the Site Manager. A permit cannot skip a tier, and it only goes live once the Site Manager has signed. The role access matrix sets who holds each role at your site.
Every live permit carries a countdown. When time is short it moves to the top of Needs attention on the dashboard, in amber, so the job is closed out or the permit is reissued before it lapses.
It is the share of inspection points that passed across the day's checks. If 92.1% of points passed, the dashboard says 92.1%. Pick a zone, Jetty 2, Tank Farm or Sector 4, to see that zone's score on its own.
A defect or hazard with its location, a severity and a due date for the corrective action. Anything past its due date turns red on the dashboard until somebody closes it.
In the document repository, next to audit reports, so the officer at the jetty reads the same SOP revision as the one in the control room.
Yes. Each site has its own team chat, and the emergency contacts list is one tap from the Team tab.
Today's site dashboard, with every permit, check and hazard on it.
Photos from Pexels